Thursday, November 02, 2006
Part 2 of Aircon Trunking +False Ceiling
Hmm well, had to separate this post as i think max number of pictures is 8..
Our City Gas piping was up also. I didnt notice this at first when i was there. Was not really looking into my kitchen. Roy thought they were doing the gas piping much later. Anyway, we were happy that the gas piping were up :)

The water pipe back to the kitchen toilet..

George was telling us during the site meeting on sat, the water cannot go upwards so the mini trunking is there.. :P really nice boss. i had not seen a boss so down to earth and running around to check on the trunking n stuff
Dinning area and HHS area of the false ceiling and the hanging light.. :P wonder what type of table will fit my hanging light.. :lol:

Living Room Console Area with Cove Lights

Going to talk to Soma tomorrow to finalize everything.. cant wait for the carpentry to be up~
my world's empty without u.
@12:36 AM